Bursa Cement Plant
What was needed?
At the Bursa Cement Plant, we designed several structures, carried out design work for a new production line, delivered construction works of different scales and made fire safety improvements.
Operational realities
We assessed the condition of several structures within the Bursa Cement Plant and identified the new building requirements arising from the plant's growing production needs. The goals were to improve the existing facilities, design the structures that would serve the new production line, and bring fire safety across the plant in line with current regulations.
How we managed it
We carried out a comprehensive study that took into account the plant's operational requirements, production processes and safety criteria. We prepared architectural and technical designs for structures of different scales, planned the required construction works and identified the fire safety improvements needed. Business continuity, safety and regulatory compliance were the priorities throughout.
Site coordination
Delivered without interrupting operations
The design, construction and improvement works strengthened the plant's physical infrastructure, met the needs of the new production line and improved the performance of its buildings.
Regulatory compliance in fire safety was achieved and the fire department's Fire Precautions Report was obtained, supporting the plant's safe, efficient and sustainable operation.
From the site
Let's assess your operational constraints, technical needs and schedule together.